Currently the SIWA Clubhouse is operational with the following phases to be rolled out:
Phase 1: 11 premium clifftop villas totalling 26 keys to open in November 2022
Phase 2: 43 premium ocean view villas totalling 47 keys to open in November 2023
Ku Villas
Operational resort with 16 keys. Additional 8 one-bedroom villas under construction and to open in March 2023.
SIWA Uluwatu
18 Luxury penthouses totalling 28 keys to open in December 2023.
Mong Hill Site
7.4 hectare premium site situated less than 2 kilometers from the Mandalika International Racing Circuit and Mandalika Special Economic Tourism Zone, South Lombok.
Matahari Site
0.5 hectare premium development site situated in the centre of the Kuta Lombok Tourism zone.